This can be pretty time consuming, but will be worth it. It takes a lot of team work, but it is manageable. First you want to paint, this will help you with coming up with ideas of what to do next. The decorative scones on the wall match perfectly with the colored paint we chose. A lot of time was spent on the flooring, this was the most consuming part. It was worked on every night for a while until it was completed. This was a long project, but it looks great and was totally worth it.
Key Takeaways:
- Things are really starting to happen during Week 4 of the One Room Challenge.
- The drywall is up, the paint is chosen, and the aged brass sconces are ready to be hung.
- The gas insert fireplace with a natural limestone mantel is absolutely exquisite.
“Our home really is built with love, and the memories we make renovating together are ones I’ll cherish forever.”
Read more: https://roomfortuesday.com/formal-living-room-one-room-challenge-week-4/
Leave a Reply